Posts

Showing posts with the label Remedial measures

Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City

Image
Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City DOI: https://doi.org/10.30564/jbms.v3i1.3149 Abstract Road constructing in Ethiopia is increasingly in demand to meet its medium and long term development programs. Most internal roads of Oromia city/town are cobblestone and gravel. Some portions along the alignment proposed and existing roads traversed low resistance of the subgrade that affect the stability of the upper layers of cobblestones. Structural failure is observed on cobblestone roads, and it would be constructed with good quality or low quality of materials. Nekemte Cobblestones Projects have been started in 2014 widely which were filled in most areas today as we observed that needs to be addressed and a corresponding remedial measures must be drawn. A possible counteractive actions had been ordered for every observed destroyed to achieve the standard road situation o...

Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City

Image
Assessment of the Cause and Effect of Early Damage of Cobble Stone Road Construction and Its Remedial Measurements: A Case of Nekemte Town Cheleleki Sub City DOI:  https://doi.org/10.30564/jbms.v3i1.3149 Abstract Road constructing in Ethiopia is increasingly in demand to meet its medium and long term development programs. Most internal roads of Oromia city/town are cobblestone and gravel. Some portions along the alignment proposed and existing roads traversed low resistance of the subgrade that affect the stability of the upper layers of cobblestones. Structural failure is observed on cobblestone roads, and it would be constructed with good quality or low quality of materials. Nekemte Cobblestones Projects have been started in 2014 widely which were filled in most areas today as we observed that needs to be addressed and a corresponding remedial measures must be drawn. A possible counteractive actions had been ordered for every observed destroyed to achieve the standard road situat...